Start Up Crossing
This is a multi-family apartment development containing 100 units on 2.22 acres. It also contains 4500 SF of common and amenity area which includes a workout room and clubhouse.
The project is also considered a Transit Oriented Development (TOD) as it is adjacent to the south Provo Frontrunner station. As a TOD, our client was able to increase density by providing a walkable access to the Frontrunner station. The intent is to provide a development that is centered around the use of mass-transit and de-emphasizes the use of passenger vehicles for commuting.
Client | Architecture Belgique and GIV Development |
Location | Provo, UT |
Project Duration | January 2014 – August 2015 |
Services | ALTA Survey, Civil Engineering, Construction Staking |