Bridge Substation
FOCUS provided construction staking for the expansion of an electric substation from approximately 2.3 acres to 6.8 acres. The project required high precision to accurately mark footing locations and offsets throughout construction. Using a total station, the team established precise staking points and marked footing locations before and after excavation.
To maintain accuracy throughout the project, FOCUS strategically placed staking points where they would remain undisturbed as construction progressed. The team also used red heads, durable metal markers, instead of traditional wooden hubs to create longer-lasting reference points. By assigning the same team member to each site visit, FOCUS maintained consistent equipment setups and reliable staking throughout the expansion.
| Client | Potelco |
| Location | Malta, Idaho |
| Project Duration | April 2026 - September 2026 |
| Services | Construction Staking |