Residents at South Point Drainage Plan
FOCUS designed a storm water collection system & detention pond for Residents at Southpoint—a 34-acre, multiphase, mixed-use development in Draper consisting of townhomes, apartments, and retail shops. In order to streamline development, avoid storm drain concerns, and maximizing available space for subsequent phases of the project, FOCUS recommended a single regional pond serving the entire development be built as part of phase one. The pond is a half acre in size and holds 77,000 cubic feet of water. Once all phases are complete, the 36” storm drain mainline will be approximately 4,200 feet in length, which is about three-quarters of a mile.
Client | Wasatch Residential Group |
Location | Draper, Utah |
Project Duration | 2020 - 2021 |
Services | Civil Engineering |