Mercedes Benz of Farmington
This is a 12-acre site for Mercedes Benz of Farmington, Utah. Focus Engineering & Surveying recently completed a boundary topography survey and obtained final approval from the city. The grading and drainage for this site was challenging as it is a relatively flat site and high water table. The Focus team needed to keep the site high enough to drain storm water, but low enough as not to cause our client a significant cost for import of construction grade fill. The project is also on some challenging soils and it has required over 200 pilings under the building structure.
Client | Wright Development |
Location | Farmington, UT |
Project Duration | August 2015 – September 2016 |
Services | Civil Engineering Design, Boundary Topography Survey, Construction Staking |