Jordan View Landing and Anderson Farms
The production townhomes presented several unique process efficiency challenges. Each townhome building was designed and engineered to be a drag and drop creation of five-unit types. This approach allowed for streamlined engineering and drafting of the project. Each building required close coordination with the builders to ensure quick, accurate construction. In addition, we had to design each product to work in multiple locations, coordinating with multiple cities to ensure a smooth submittal process.
Client | ICO Construction |
Location | Saratoga Springs and Lindon, UT |
Structural Engineering Turnaround | 5 days per building for redesigns |
Services | Structural Engineering, Site Civil Design, Vertical Engineering, Drafting |